With the height, number of strands and strand spacing pre-determined, install the tensioners first and then the insulators. Typically the center of the top strand is 4 " from the top of the post. Attach top strand tensioners and insulators 4" on center from the top of the post. When using wood post sleeves on corners and gates, measure 4 " from the bottom edge of the cap.

R50.gif

To install tensioners drill an 1/8th inch pilot hole in the post to accept the wood lag. Caution: Tighten the wood lag to the point of snug and no further. Over tightening the wood lag may crack the plastic body of the tensioner and allow internal arching into the post.

R16.gif

Attach the J16W insulator on wood posts with 1 3/4" stainless steel screws (HSS175). R16_on_wood.gif